PAINTER PAYROLL · RESIDENTIAL, COMMERCIAL & INDUSTRIAL

Paid by the foot. Owed by the hour. WageTime runs both on one check.

Painting settles up in pieces: a price per square foot, a rate per room, a cut of the job when it closes. None of it waives overtime, which is exactly the math WageTime runs for painting crews.

Built on infrastructure processing $35B+ in payroll & taxes · 4.3M+ W-2s & 1099s filed
SOUND FAMILIAR?

Production pay, a 1099 habit, and an estimate that never hears back from the jobsite.

A painting company’s payroll problems don’t look like a GC’s. The comp is piece and percentage, the workforce is your own brush hands on contractor paper, and the number that decides every bid, the production rate, lives in an estimating app the timesheets never talk to.

PAID BY THE FOOT, OWED BY THE HOUR

Piece rate doesn’t waive overtime

A painter on a per-foot rate who works 52 hours is owed overtime on a regular rate the week itself defines: piece earnings divided by hours, premium on top. One Mesa painting company paid $432,633 in overtime back wages, doubled as damages, for 158 painters paid per square foot with no overtime. The spreadsheet version of this math fails quietly for years, then all at once.

THE 1099 HABIT

Your own brush hands, on contractor paper

Painting’s misclassification pattern isn’t the plumber you sub out. It’s the two painters on your own crew getting a 1099 because that’s how the shop that trained you did it. The Labor Department’s answer is blunt: receiving a 1099 does not make anyone an independent contractor. Painting companies keep relearning that in back-wage judgments.

PERFORMANCE PAY, SETTLED BY HAND

The crew’s cut lives in a spreadsheet

Plenty of painting companies pay production: the crew splits a percentage of the job’s labor budget, and finishing early raises everyone’s effective rate. It motivates exactly the way the consultants promise. It also settles in a spreadsheet someone rebuilds every Friday, where its interaction with the week’s overtime is anyone’s guess.

THE UNAUDITED ASSUMPTION

The production rate never reports back

Every estimate prices the work off an assumed production rate: so many square feet an hour, from a cost guide or the defaults in the estimating app. The actual rate exists only if hours come home coded to the job. When the week lands as one lump, the assumption never gets audited, and the next bid inherits the miss.

THE BID YOU CAN’T ENTER

QP work runs on certifications

Bridge, tank, and water-tower repaints increasingly require AMPP QP accreditation, and QP 1 contractors must put CAS-certified applicators on blast-and-spray metal jobs over $100,000. The certs expire, the certified payroll is due weekly, and both live in binders nowhere near the payroll that has to back them up.

Four answers below, piece rate first.
01 · PIECE RATE, RUN LEGALLY

Per-foot pay codes, overtime on the blended rate.

Piece rate runs as a first-class WageTime pay code, per square foot, per room, per door, and overtime computes on the weighted-average regular rate: the week’s earnings over its hours, premium on top, itemized on the stub.

  • The exact calculation the Labor Department keeps winning judgments on.
  • Mixed piece-and-hourly weeks settle through weighted-average overtime.
  • Minimum-wage backstop at federal, state, and local levels.
app.wagetime.com/payroll/piece-week

Piece-Rate Week · Marisol V. · Jul 6-12

Piece + hourly weekOT on blended rate
Piece at $0.48 a square foot and $28.50 a door, punch-list hours at $22.00: the week’s $1,449.00 over 46.0 hours sets the regular rate, and the premium runs at 0.5 × it
Marisol V. · piece + hourly week
Walls · 2,150 sq ft$1,032.00
Doors, frames · 10 doors$285.00
Punch list · 6.0 hrs$132.00
Blended regular rate$31.50/hr
OT premium · 6.0 OT hrs$94.50
Gross wages$1,543.50
46.0 hours · one check, OT itemizedpiece money and hours in one regular rate

Replaces the spreadsheet that divides piece money by hours, and the audit that eventually does it for you.

02 · THE CREW’S CUT, ON THE CHECK

Percentage and performance pay through real pay codes.

The crew’s cut of the job’s labor budget settles through WageTime’s tiered commission structures, as a computed line on a real paycheck, and the finish-early bonus pays the week the job closes on an off-cycle run that costs nothing.

  • Performance pay lands as wages in the week’s pay records.
  • Night and weekend differentials for after-hours commercial work.
app.wagetime.com/payroll/bonus-run

Bonus Run · Cedar Ridge repaint close-out

Off-cycle · $0 extraJob closed 4 days early
The crew’s cut of the job’s labor budget computes inside the run and lands as wages, itemized on each stub
Marisol V.Crew lead$348.00
3.0% of the job’s labor budget
Deon C.Painter$232.00
2.0% of the job’s labor budget
Sam R.Painter$232.00
2.0% of the job’s labor budget
Lena K.Apprentice$116.00
1.0% of the job’s labor budget
4 painters · off-cycle run, no extra fee$928.00paid Tue Jul 15

Replaces the Friday-night spreadsheet that splits the crew’s cut, and the month-end wait to pay it.

03 · THE ESTIMATE MEETS ITS ACTUALS

Job-coded hours give the production rate a report card.

Every painter hour goes back to the job it was worked on: punches arrive GPS-stamped inside the jobsite’s geofence, pre-sorted by phase, so the estimate’s assumed production rate finally gets its report card.

  • Cost codes shaped like the estimate: room, floor, prep versus finish.
  • WageTime reports labor cost by project and crew, ready to set beside the bid.
  • Finished payroll posts to QuickBooks mapped by department.
app.wagetime.com/reports/labor-actuals

Labor Actuals · Hillcrest exterior repaint

Punches GPS-stampedCoded to 3 phase codes
Punches arrive inside the jobsite geofence, pre-sorted by phase, so the estimate meets its own actuals
147.0Hours on the job
$3,528.00Labor cost
3Phase codes
PhaseHoursLabor cost
Prep: wash, scrape, mask2 crew · geofenced punches41.0$984.00
Body and trim, two coats3 crew · geofenced punches88.5$2,124.00
Doors, shutters, punch list1 crew · geofenced punches17.5$420.00
Every painter hour comes home coded to its phasecoded to 3 phase codes

Replaces the production rate that never gets audited, and the next bid that inherits the miss.

04 · CERTS THAT WIN BIDS

QP-side credential tracking, certified payroll on the same jobs.

WageTime keeps you bid-ready on two fronts: CAS cards, refreshers, and fit-test dates tracked with 30, 60, and 90-day alerts, and certified payroll for the bridge and DOT repaints as an add-on, scoped and priced on the demo.

  • AMPP requires CAS-certified applicators on QP 1 metal jobs over $100,000.
  • WH-347 certified payroll generated from the run, as an add-on.
  • Prevailing-wage rules per classification, fringe as cash or bona fide plans.
  • IUPAT locals, dues checkoff, and fund remittances, also an add-on.
app.wagetime.com/hr/certifications

Certifications · Industrial Crew

1 expiring in 60 daysDocuments on file
CAS cards, refreshers, and fit-test dates tracked on the employee record, with alerts ahead of every expiry
4Credentials tracked
1Alert open
PainterExpiresStatus
Deon C.AMPP CAS Level 2Feb 2028Current
Marisol V.AMPP CAS Level 1Sep 2026Renew in 54 days
Sam R.Respirator fit testJan 2027Current
Lena K.OSHA 10Nov 2027Current
Every credential the QP bid depends on, in one placedocuments on file

Replaces the cert binder in the shop truck, and the QP audit that finds the lapsed card before you do.

PRICING

Simple payroll pricing. No surprises.

Full-service payroll is $10 a month per person paid that month, plus $50 a month per company, with unlimited runs. No long-term contracts, no per-run charges.

  • Full-service payroll, unlimited runs
  • Federal, state & local tax filing
  • Year-end W-2s & 1099s
  • Direct deposit, checks & pay cards
  • Contractor payments & filings
  • Off-cycle runs & bonuses, no extra fee
  • Employee paystubs & W-2 access
  • QuickBooks integration
$10/mo per person paid
+ $50/mo per company

Off-cycle runs and bonuses cost nothing extra. No long-term contracts; cancel anytime.

Example: 50 people paid × $10 + $50 company = $550 for the month

HR & hiring, onboarding, PTO, time tracking, benefits, and workers’ comp are optional add-ons, priced separately when you’re ready.

See a demo
THE INFRASTRUCTURE BEHIND WAGETIME
$35B+
in payroll & taxes paid
2.8M+
employees paid
4.3M+
W-2s & 1099s filed
100%
of tax filings automated

Painting contractor payroll FAQ

Our painters are on piece rate. Do we still owe overtime?

Yes. Federal law computes a regular rate from the week’s piece earnings divided by hours worked, and overtime is owed on that rate. WageTime runs per-unit pay codes (per square foot, per room, per door) and computes weighted-average overtime automatically when a week mixes piece and hourly work or passes forty hours.

Can I just put my painters on a 1099?

That call stays yours, and the form doesn’t settle it: the Labor Department says receiving a 1099 does not make someone an independent contractor. WageTime doesn’t give classification advice. It runs the W-2 painters and 1099 crews you designate on one payroll and files both year-end forms from the payments actually made.

Can WageTime pay our crews a percentage of the job?

WageTime settles percentage-based compensation through tiered commission structures, and production bonuses pay through off-cycle runs at no extra cost. The payout lands as wages inside the run, itemized on the stub, instead of living in a side spreadsheet someone reconciles by hand every Friday.

Our estimates are in PaintScout or DripJobs. How do hours get into payroll?

Estimating apps hold the assumed production rates; the hours come from the field. Crews punch on WageTime’s GPS-stamped mobile clock, geofenced per jobsite, with hours coded to the job. Already using a time app? We import clock hours so there’s no double entry; tell us your system on the demo and we’ll confirm the exact flow for your setup.

We bid QP-gated industrial work. Can WageTime keep us audit-ready?

WageTime tracks each applicator’s certifications (CAS, refreshers, fit tests) with 30, 60, and 90-day expiration alerts and stores the documents on the employee record. Certified payroll for public bridge and DOT work is an add-on, scoped and priced on the demo: WH-347 reports generated from the run. The QP accreditation itself stays yours.

What does painting payroll cost with WageTime?

$50 per month per company plus $10 per person paid that month, with unlimited runs: weekly pay, off-cycle bonus runs, and final checks at no extra cost. Certified payroll and union payroll are add-ons, scoped and priced on the demo. Switching is full-service and paid; we’ll scope it with you.

Bring one piece-rate week.

One week of piece sheets or time-app hours, your pay deal (the rate per foot, the crew’s cut, the bonus plan), and an estimate you’d like to see audited by its own actuals. Twenty minutes with a payroll specialist on a live demo company: the piece week runs, the overtime itemizes, and the invoice math is on the screen.

Book a 20-minute demo