HARDSCAPE & DESIGN-BUILD PAYROLL · PROJECTS, DAY RATES & CLASS CODES

The day rate still owes overtime. WageTime blends it in the run.

WageTime is payroll for hardscape and design-build contractors, where the pay unit is a day or a job, the comp class steps up the moment someone lays block, and labor has to land on the project and its phases, not a weekly route.

Built on infrastructure processing $35B+ in payroll & taxes · 2.8M+ employees paid
SOUND FAMILIAR?

Payroll built for a mowing route meets a business that builds one patio at a time.

Design-build and hardscape are the fastest-growing corner of the green industry (Mordor Intelligence estimates hardscape and design-build growing near 8.35% a year while maintenance held about 44% of the market in 2025). The payroll behind it looks nothing like a route: the pay unit is a day or a job, the workers’ comp class steps up the moment someone lays block, and the same run carries designers, salespeople, and crews.

PAID BY THE DAY

The day rate still owes overtime

Install crews on hardscape work are usually paid a flat day rate or a per-job rate, not by the hour. That does not turn off overtime. Under 29 CFR 778.112 a day rate converts to a regular rate by dividing the week’s day-rate pay by the hours actually worked, and every hour over 40 owes an extra half of that rate. A crew that pours base until dark all week is earning overtime whether the day rate mentions it or not.

THE CLASS STEPS UP

The wall crew isn’t in the mowing code

Workers’ comp classifies dry-laid patios and on-grade paths as landscape gardening, code 0042. Build a garden wall out of block or stone and the work steps into masonry, code 5022; pour and finish concrete flatwork and it steps into 5221. Those codes cost more, and the auditor charges the highest one to your whole payroll unless your records split the hours by class of work.

FOUR CARDS, NOT ONE

CMHA certs renew on their own clocks

The old ICPI and NCMA merged into the Concrete Masonry & Hardscapes Association, and its installer program now spans four separate applications: interlocking pavement, segmental retaining walls, permeable pavement, and manufactured stone veneer. Each credential renews on its own schedule. A card that quietly lapses can pull a crew off a spec’d job, and a spreadsheet never sends the reminder.

THE PROJECT IS THE UNIT

There’s no weekly route to cost against

A patio is not a Tuesday visit. It runs in phases, excavation, base, install, and finish, with a materials line that dwarfs a mow crew’s, and the labor has to land on the project and the phase or the next bid is a guess. Route-shaped payroll has nowhere to put those hours, so they land in a spreadsheet and fall off the estimate.

SOLD IN MARCH, FINISHED IN JUNE

Commission that pays in two pieces

Design-build sells the job months before the crew breaks ground. The salesperson’s commission is often paid partly at signing and partly at completion once the real cost is in, the designer draws a salary or a base with a bonus, and the crew is on day rates. That is three pay structures in one run, and a mowing payroll has seen exactly one of them.

Every one of these is a pay code, a class-tagged report, or an expiry alert below, built for a shop that builds instead of mows.
01 · DAY RATE, DONE RIGHT

The flat day survives the overtime math.

Day rates and per-job rates run in WageTime as pay codes, with the 29 CFR 778.112 math figured in the same run: the week’s day-rate pay divided by hours actually worked, plus an extra half of that rate for each hour over 40.

  • Day-rate and per-job pay codes, next to hourly and per-unit.
  • Per-square-foot and completion bonuses in the regular rate.
  • Overtime on the blended rate for any mixed-method week.
  • Minimum-wage processing by federal, state, and local rule.
app.wagetime.com/payroll/week-detail

Week Detail · Diego M. · Paver Install

Day rate + bonusOT on blended rate
Regular rate from the week’s day-rate pay, divided by hours actually worked
Diego M. · day rate + bonus week
5 install days at $220.00$1,100.00
900 sq ft bonus at $0.15$135.00
Blended rate · 47.0 hrs$26.28
7.0 OT hrs · 0.5 × $26.28$91.98
Gross pay$1,326.98
Day-rate overtime figured in the same runclears minimum wage for all hours worked

Replaces the day-rate handshake that forgot overtime, and the audit that remembers it.

02 · THE CLASS FOLLOWS THE WORK

Hours tagged softscape or masonry, before the auditor asks.

Every hour and wage dollar tags to a class of work in WageTime, so the same crew’s Monday planting sits in landscape gardening and its Tuesday retaining wall sits in masonry, split on the record instead of guessed at year end.

  • Class-of-work tags on every hour, softscape and hardscape apart.
  • Job-cost codes up to 40 characters, matched to your class scheme.
  • Per-run archived records, not a year-end reconstruction.
  • Audit-ready change logs behind every timesheet edit.
app.wagetime.com/reports/labor-by-class

Labor by Class of Work · June

3 classes taggedAudit-ready records
348.0June hours
$8,260.00June labor cost
Class of workHoursLabor cost
Landscape gardening 0042Crew 196.0$1,632.00
Masonry, walls 5022Crew 2128.0$3,072.00
Concrete flatwork 5221Crew 284.0$2,016.00
Design & sales officeStaff40.0$1,540.00
Softscape and hardscape hours split on the recordsplit by class for the comp audit

Replaces the shoebox reconstruction in May, and the top comp rate charged to your mowers.

03 · EVERY CARD ON A CLOCK

ICP, SRW, PICP, and MSV, watched before they lapse.

WageTime tracks credentials per installer with recurring 30, 60, and 90-day expiration alerts, so each of the four CMHA installer cards gets its reminder while there is still time to renew, not the morning a spec’d job needs it.

  • Track ICP, SRW, PICP, and MSV certs separately, per installer.
  • Recurring 30, 60, and 90-day expiration alerts.
  • Contractor licenses and CDLs tracked on the same record.
  • Credential documents stored on the employee’s file.
app.wagetime.com/hr/credentials

Credential Watch · Install Team

Alerts on
4Expiring in 90 days
3Alerts this week
EmployeeExpiresStatus
Diego M.CMHA SRW installerAug 14Renew soon
Diego M.CMHA ICP installerMar 02Current
Ray P.CMHA PICP installerSep 09Renew soon
Ray P.State contractor licenseJan 20Current
Marcus T.CDL Class BAug 30Renew soon
Every card watched on the employee recorddocuments on file per employee

Replaces the lapsed card discovered on the jobsite, and the bid lost for want of a certified installer.

04 · COST THE PROJECT, NOT THE ROUTE

Labor by project and phase, against the estimate.

In WageTime, every hour codes to a project and its phase: excavation, base, install, and finish. Labor cost lands where the estimate put it, so the patio that ran three days long shows up before the next one is priced.

  • Labor cost by project, phase, and crew, every run.
  • Job-cost codes adjustable to your estimate and phase numbering.
  • QuickBooks posting by department; GL export in CSV, IIF, or fixed-width.
app.wagetime.com/reports/labor-by-project

Labor Cost by Project · Q2

Coded to phasePosts to QuickBooks
280.0Quarter hours
$6,272.00Quarter labor cost
Project / phaseHoursLabor cost
Oakmont patioinstall · Crew 288.0$2,112.00
Oakmont patiofinish · Crew 232.0$768.00
Ridgeline retaining wallbase · Crew 164.0$1,088.00
Ridgeline retaining wallinstall · Crew 296.0$2,304.00
Overruns show before the next patio is pricedreported by project and phase

Replaces pricing the next patio off a guess, and finding the overrun after the check clears.

05 · SOLD, BUILT, THEN PAID

Designers, salespeople, and crews in one run.

The design-build comp mix closes in a single WageTime payroll: salaried designers, salespeople on tiered percentage commission, and crews on day rates, with the commission paid part at signing and the balance at completion running as its own pay code.

  • Salaried designers, commissioned sales, and day-rate crews in one run.
  • Tiered, percentage-based commission for sold design-build work.
  • Split payouts entered at sale and at completion as commission codes.
  • 1099 subcontractors alongside W-2 crew, both filed at year end.
app.wagetime.com/payroll/run-mix

Payroll Run · Design-Build · Jun 26

3 pay structures1099 + W-2
Nora K.Designer$1,730.77
Salary · same run as the crews
Alex D.Sales$1,140.00
Commission · completion 30%
Diego M.Install crew$1,326.98
Day rate + OT on blended rate
Base Excavation LLCSubcontractor$2,400.00
1099 · filed at year end
Mixed pay types · one runW-2 and 1099 filed at year end

Replaces three pay structures in three systems, and the commission owed at completion that nobody tracked.

PRICING

Simple payroll pricing. No surprises.

Full-service payroll is $10 a month per person paid that month, plus $50 a month per company, with unlimited runs. No long-term contracts, no per-run charges.

  • Full-service payroll, unlimited runs
  • Federal, state & local tax filing
  • Year-end W-2s & 1099s
  • Direct deposit, checks & pay cards
  • Contractor payments & filings
  • Off-cycle runs & bonuses, no extra fee
  • Employee paystubs & W-2 access
  • QuickBooks integration
$10/mo per person paid
+ $50/mo per company

Off-cycle runs and bonuses cost nothing extra. No long-term contracts; cancel anytime.

Example: 50 people paid × $10 + $50 company = $550 for the month

HR & hiring, onboarding, PTO, time tracking, benefits, and workers’ comp are optional add-ons, priced separately when you’re ready.

See a demo
THE INFRASTRUCTURE BEHIND WAGETIME
$35B+
in payroll & taxes paid
2.8M+
employees paid
4.3M+
W-2s & 1099s filed
100%
of tax filings automated

Hardscape & design-build payroll FAQ

How do I pay my hardscape crew: day rate, hourly, or per square foot?

Any of them, and mixed in the same week. WageTime runs day rates, per-job rates, hourly, and per-square-foot bonuses as pay codes side by side. When a week mixes methods, overtime computes on the weighted-average regular rate automatically, so you pick the pay that fits the job and the math still lands right.

If I pay a flat day rate, how is overtime calculated?

By the federal day-rate rule, 29 CFR 778.112: the week’s day-rate pay is divided by the hours actually worked to get the regular rate, and each hour over 40 owes an extra half of that rate. WageTime does this in the run, folding any per-square-foot or completion bonus into the regular rate first, so the day rate never quietly underpays overtime.

What workers’ comp class code applies to my paver crew, and can I split payroll?

Dry-laid paving as part of a landscape job is often landscape gardening (0042), while block or stone walls step into masonry (5022) and concrete flatwork into 5221. You can carry more than one class only with records split by employee and task. WageTime tags every hour to a class of work, so the audit sees the split instead of charging the top rate to everyone.

Can WageTime track my CMHA installer certifications before they expire?

Yes. WageTime tracks credentials per employee with recurring 30, 60, and 90-day expiration alerts, and the four CMHA applications, ICP, SRW, PICP, and MSV, each get watched on their own renewal clock. Contractor licenses and CDLs sit on the same record, with the card image stored on the employee’s file.

How do I job-cost labor by project and phase instead of by weekly route?

Every hour codes to a project and a phase, excavation, base, install, or finish, with job-cost codes up to 40 characters that match your estimate numbering. Labor cost reports come out by project, phase, and crew, so an overrun shows up before you bid the next one, and finished payroll posts to QuickBooks by department.

How do I pay salaried designers, commissioned salespeople, and day-rate crews together?

In one run. WageTime carries salary, tiered percentage-based commission, and day-rate pay in the same payroll, and 1099 subcontractors run alongside W-2 staff. A commission split between the sale and job completion is entered as a commission code on the runs it belongs to, so the completion payment is not something you have to remember by hand.

Our hours live in Aspire or another field system. How do they get into payroll?

We import clock hours so there’s no double entry. Tell us your field or estimating system on the demo and we’ll confirm the exact flow for your setup, including how the phase and 0042 or 5022 class-of-work tags ride the import instead of falling off in the export. No system yet? Crews can punch on WageTime’s own GPS-stamped, geofenced mobile clock instead.

Bring one project through payroll.

A recent patio or wall job, the crew that built it, and how you pay them: day rate, hourly, or per square foot. Twenty minutes with a payroll specialist on a live demo company, and you’ll see the day-rate overtime blend, the class-of-work split, the credential alerts, and the labor cost land on the project instead of a route.

Book a 20-minute demo